The brief
Another region, the same support
The house is just outside Sunrise Energy’s usual area, in another autonomous community with its own permits and rules. The team started on those straight away, and José came beforehand to work out the best layout on the roof and where the equipment would go.

- 01
Permits in another region
The permits and regulations for the Region of Murcia were taken on from the start.
- 02
Layout checked in person
José looked at the best distribution of the fifteen panels and the place for the equipment.
- 03
Connected and registered
Joëlle handled the aftercare and the registration with Iberdrola; export and the virtual battery work.



